Finished up the bathroom this weekend. Had to buy a new drain piece to stop the leak. Since this was an engineered vessel sink made from a standard copper basin, a little engineering was required to make it all watertight.
E asked me to put some shelves in the coat closet, so got that done too. Look pretty good if I do say so myself.
Got the ‘feet’ on the vanity and leaks fixed – so I’m calling the bathroom done.