October – Finally tackled the left side of the driveway entrance.
A base made up of pieces of Skeenah Gap Rd with a rock top held together with lots of concrete. Should outlive me.
When Spring gets here the middle will be filled with decorative low growing ground cover.
Elaine & I built a rock ‘hearth’ and a mantle. Something Elaine has wanted for a while, but I resisted since I don’t like to cover the beautiful log walls.
And we made a canopy for our bed and lit it up (in more ways than one!)
November – more work on the driveway. Almost done.